05
About JETEX HQ, DWC
Stonehaven was appointed by JETEX in 2022 to provide pre and post contract project management and cost consultancy services for the new JETEX Global Headquarters located in Dubai World Connect Airport. From pre-concept through construction and to handover, Stonehaven procured, awarded, and administered all consultants consisting of lead design, specialist design and supervision as well as the piling and main contractors. Procurement was traditional on a fixed price lump sum subject to competitive tender. JETEX Headquarters consisted of a basement, ground floor and one upper floor with approximate built-up area of 12,000m2. The project consisted of substructure, superstructure, mechanical and electrical, specialist façade, interior fit out and landscape.

Designed in REVIT (LoD 350)
Fully Coordinated using Navisworks and Openspace AI.
Advanced Security Tech
Biometric access and smart surveillance.

Expansive Facility
The headquarters encompasses a 12,000 sqm area.
Sustainability Certified
Achieved LEED Gold status for eco-friendly operations.
Designed in REVIT (LoD 350)
Fully Coordinated using Navisworks and Openspace AI.
Expansive Facility
The headquarters encompasses a 12,000 sqm area.
Expansive Facility
The headquarters encompasses a 12,000 sqm area.
Sustainability Certified
Achieved LEED Gold status for eco-friendly operations.