05
About JETEX Airport Lounge, Al Bateen
Stonehaven was appointed by JETEX in 2023 to provide pre and post contract project management and cost consultancy services for this private airport lounge located in Al Bateen Airport. From pre-concept through construction and to handover, Stonehaven procured, awarded, and administered the lead design consultant, specialist design consultant and the main contractor. The main contract was competitively procured on a turnkey basis given the fast-track nature of the Project as it had to be ready in time to service the COP28 international climate event. The airport lounge consisted of a ground floor with an approximate built-up area of 1,500m2. The project consisted of existing building modification, mechanical and electrical, specialist façade, interior fit out and landscape.
Designed in REVIT (LoD 350)
Fully Coordinated using Navisworks and Openspace AI
BUA: 7,200m2
Estidama – 4 Pearl Rated
Solar panels and energy storage systems
Advanced Security Tech: Biometric access and smart surveillance.
Imported 500-year-old Olive trees from Spain
Designed in REVIT (LoD 350)
Fully Coordinated using Navisworks and Openspace AI
Solar panels and energy storage systems
Advanced Security Tech: Biometric access and smart surveillance.
Solar panels and energy storage systems
Advanced Security Tech: Biometric access and smart surveillance.